The Project

Pacy and Wheatley Interiors have completed a hotel refurbishment for the Holiday Inn in Salford Quays, Manchester. The Holiday Inn is a small contemporary hotel set by the water. The hotel overlooks the Manchester Ship Canal within the Salford Quays development and was built in about 2001. It was decided earlier this year to upgrade the breakfast dining area.

We were appointed on a negotiated cost basis to carry out an upgrade to the tired looking breakfast room. The works involved upgrading the Corian worktops within this area as they had become worn and scratched with cracks appearing which looked unprofessional and were potentially becoming unfit for purpose. We carried out repairs to the worktops and replaced the ones which were beyond repair.

The works needed to be coordinated in such a way to minimise disruption to guests staying at the hotel. This meant that we could not commence our works until after 10am and we had to vacate the area by 5pm.

The solution achieved was a brighter, more functional breakfast dining experience.