Retail Fit Out, Bristol

Project Description

P&W Interiors took over an existing new build shell in Bristol and was appointed to carry out the retail fit out of the project. The storage centre consists of 4 floors which have been fitted with storage units. The works undertaken by P&W were to create and fit out the customer reception area, install new Toilet facilities, all new Fire escape doors, new Flooring, full Decoration works, Wall protection, formation of a Lift Shaft, and also the formation of 2 Stair pods.

Sheffield Children’s Hospital

The Project

Pacy & Wheatley Interiors have recently completed the Helicopter Pad installation project at Sheffield Children’s Hospital. The works included interior fit-out works for the access/egress from the helipad into the hospital, ensuring a smooth and efficient patient transfer process, and mechanical and electrical service installation for the new helicopter pad. The project was completed in June 2024 and is in line with our programme. It has taken hard work and determination to deliver this flagship project, and is a testament to our team’s hard work, dedication, and expertise.

Well done to our Projects Manager, Steve Shaw, Quantity Surveyor Charlotte Wheatley, Site Manager Duncan Henderson and his site team for their hard work and commitment to what was a challenging project both logistically and from a health and safety perspective.

Our construction team also worked on this project, completing the erection of a new complex steel frame and cladded structure that houses two new lifts, a plant room, and new fire escape stairs leading to the main building.

View Footage

School Education Refurbishment, Pontefract

Project Description

Pacy & Wheatley have been lucky enough to be able to complete further upgrade works for Ash Grove Primary School. These works focused on transforming the external features of the infant building with the installation of new Rockpanel cladding, double-glazing window units, and aluminium fascia to replace the weather timber boards that were previously there.

The work is not just to improve the aesthetic qualities of the building but also to improve the thermal and acoustic qualities to benefit the children.

Healthcare New Build, York

Project Description

Here at Pacy & Wheatley Interiors, we are privileged to be working with McLeod & Aitken and Barchester Healthcare, who are returning old clients of ours. This new-built care home has experienced an increase in dementia patients, so urgent upgrades to the second floor had to be completed to ensure their comfort and safety.

The refurbishment consisted mainly of decoration and new flooring in the corridors and amenity rooms to follow the Memory Lane scheme and safety features that are assigned to all Barchester Healthcare homes. We also transformed an old therapy room into a new sensory room by installing a star gaze ceiling panel to bring the beautiful night sky indoors for everyone to enjoy.

Interior Fit Out Blackpool Pleasure Beach

Project Description

We were approached by a new client back in 2022 in regard to the potential major refurbishment of the Pleasure Beach Arcade in Blackpool. The challenge was to strip out all of the internal finishes of the Arcade, including wall boarding, lighting ceilings and floor finishes. The programme on this particular site was very challenging, as were the logistics involved. However, our team battled manfully and achieved completion on time and within budget. The end result is now a much better, fresher and cleaner Arcade, which is now much more user-friendly for visitors. A whole new lighting scheme was installed, new carpeted areas were installed, and full decoration and feature walls and ceilings were installed.

Great effort was made by on-site supervisor Rio Shaw and his site team. The project was completed to very high health and safety standards, resulting in zero accidents.

Hospitality Refurbishment Bedford

Project Description

Holiday Inn Express, Bedford Hotel is the second of the refurbishment projects Pacy & Wheatley have been selected to complete for Atlas Hotels, the brief being to refurbish the bar and breakfast area totally. The work included in this project included new flooring, lighting, and new bespoke joinery furniture, including a granite worktop for the existing breakfast servery area, decoration, and supply and installation of fixed furniture for the designated areas. The end result creates a more modern and fresh eating and drinking area, ensuring a better and more relaxing feel for the Hotel guests. 

Holiday Inn Express Bedford was completed in 10 working days and successfully handed over to a very happy client. A big well done, and thank you to our site team, which includes Warren Horton and James Hilditch.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Error: Contact form not found.

      Contact me regarding... Retail Fit Out, Bristol

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.