The Project

Pacy & Wheatley were appointed on a tendered cost basis to carry out the external and interior refurbishment of the emergency department area 1 of Doncaster Royal Infirmary hospital which is the place where people brought in by Ambulance are admitted. This area of the Hospital was originally built in the late 1960’s. The works involved creating a new space between A&E admission and some existing back office space for Ambulance teams to bring patients into the building. The works were undertaken over a 13-week period pre- and post-Christmas 2020. The work also included the installation of new admin reception areas including new state of the art glazed counters, new flooring, full decoration and the installation of a new ceiling system. New Water supplies and a heating system was also installed. Externally new automatic entrance/exit doors were fitted and the car park within the designated area was resurfaced in order to ease the use of trolley beds gaining entrance to the newly formed area The solution has resulted in a brighter more modern entrance area which logistically eases the pressure on the NHS staff operating in this department. The new facility has been received very favourably by all of the staff and patients arriving into the Hospital who will now receive quicker, more professional treatment within a very modern state of the art facility.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Interior Refurbishment Doncaster Royal Infirmary

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.