Rockfon Case Study

Testimonials.

Projekt Architects

Aldi, Whitehaven

Pacy & Wheatley Interiors have recently completed the interior fit-out of a new build Aldi store in Whitehaven, Cumbria. The site and project Management team from Pacy & Wheatley worked diligently and professionally throughout the fit-out works to deliver a finished product which we are all very impressed with. The works produced are of a very high standard, and the client appears to be very satisfied with what has been achieved. As always, there are bumps in the road on these projects. However, the team on site dealt with everything thrown at them, especially towards the end when practical completion was looming.

Another impressive performance from the Pacy & Wheatley team, and I hope that they keep up the good work on future projects.

A big well done to all involved.

Dave Forrest – Construction Director

Department for education, North Yorkshire

North Yorkshire, Melbourne School

The Pacy & Wheatley group were actively involved in tendering for the installation of a new external standalone classroom. This project was awarded based on a design and build contract. The works initially involved the demolition of an existing external classroom in order to clear space for the setting out and installation of the new classroom. The works undertaken in creating the new classroom involved a quite intricate drainage design so as to make use of the space available with the intention of low maintenance and at an affordable cost, which we believe has been achieved.

Read More

NHS Children's Hospital

Sheffield Children’s Home (Helipad)

The Pacy & Wheatley group were actively involved in tendering for the installation of a Helipad at the Sheffield Children’s Hospital, and after a period of confirmation of specification/s were awarded this project. The award was based on costs, quality of tender submission and what was also taken into consideration was the past performance on previous projects carried out on this site by the Pay & Wheatley group. This project in itself presented a huge challenge to all involved, including the appointed Architect, Structural Engineer, and the Hospital Estates department, all working together in order to deliver this prestigious legacy project.

There were many challenges which presented themselves whilst the works were in progress, but both the Pacy & Wheatley site team and project Management team, along with the dedication and professionalism of the supply chain, ensured that collectively all of these challenges were eventually overcome. Pacy & Wheatley and their site team had to endure severe Weather conditions through the Winter months, whilst works were in progress, when on a few occasions, crane lifts had to be suspended due to high Winds and driving Rain.

Read More

Peter Knowles – Estates Director

aldi

Aldi

Pacy & Wheatley Interiors have recently completed a fit-out project at the Aldi store on Mill Lane in Durham. They were commissioned to carry out this project based on tendering on a schedule of rates. I would like to say that I was extremely pleased with the level of professionalism adopted by the Pacy & Wheatley team in regard to delivering this project. These types of projects are demanding in terms of time and logistics, and Pacy & Wheatley, despite not carrying out a fit-out for Aldi for a number of months, adapted adequately and positively to the demands imposed on them. The project was delivered to a high standard, on time and to budget. The whole Pacy & Wheatley team were dedicated and diligent in their approach to delivering this project, and I can say that I would have no hesitation in both recommending them for future projects of this kind, and I would also be relaxed and happy to work with them again in the future.

A big well done to the Pacy & Wheatley team

Dave Forrest – Construction Director

nuh-nhs

Nottingham University Hospitals, NHS Trust

Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

Phil Colebourne – Snr Projects Manager

boxx-storage

Boxx Storage

Pacy & Wheatley were commissioned following a successful tender submission to carry out the full refurbishment of a new build modern self-storage facility. This project was based on a 30-week fit-out programme, of which Pacy & Wheatley carried out the Principal Contractor role. I have worked with Pacy & Wheatley since 2015 where they have carried out numerous fit out contracts for our company and in all the time, I have worked with them they have always been very engaging and professional in their approach to these projects. Some of our projects on existing buildings have required major demolition works internally, and Pacy & Wheatley have procured and managed all of the aspects of demolition. I mention the demolition as I realise that this element of work is not something Pacy & Wheatley Interiors carry out on a regular basis, but as always, they sourced a reputable demolition company, which they managed successfully, resulting in the demolition works being completed on time and to budget. I would also like to add that these projects are demanding and subject to many changes along the way, all of which Pacy & Wheatley dealt with, which, from my point of view, is exactly what I expect from them.

I am highly delighted with recommending Pacy & Wheatley to other prospective clients, as I have enjoyed working with them over the years and look forward to working with them again in the future.

Tom Phillips

ready-steady-store

Ready Steady Store

I have worked with Pacy & Wheatley for many years on a variety of projects, all within the Self-Storage sector. We have worked together on very large multi storey sites as well as renovating dilapidated old buildings into state of the art 24 hour access centres. In all the time I have worked with Pacy & Wheatley, I have found the service received to be of the very best quality in terms of price, availability, flexibility and an overall can-do attitude. The quality of the finished product has always been to or over the expected standard. The projects we work on are varied in terms of accessibility, location and the logistics involved. The projects, whilst adequately put together in terms of the scope of works, always present challenges along the way, things change, get moved, paint colours change, amongst a whole raft of other challenges. Pacy & Wheatley deal with these changes, diligently plan the works needed to implement these changes and get on with the challenges as they are presented. I cannot recommend them highly enough in terms of the service they provide and would have no hesitation in recommending them to any of their potential new clients.

It has been a pleasure working with them over the years, and I am looking forward to maintaining our working relationship in the future.

Gary Myhill – Head of Facilities and Projects.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Testimonials

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.