Hotel Fit Out.

Hotel Fit-Out Contractors

Pacy & Wheatley Interiors is a hotel fit-out contractor in the Hospitality sector with over 10 years of experience working with various operators. Over the years, we have carried out work for Blue Chip Hotel operators, such as Marriott, Holiday Inn, Holiday Inn Express, and a number of private operators. We have been involved in numerous projects for the operators detailed above and in many different areas of the UK, from the far North of Scotland to the South West of England.

The refurbishment works we are involved with vary from pure decoration works or new flooring works to very high-value bedroom refurbishments and public area upgrades. The biggest challenge with working in hotels is that from an operational perspective, there are no times when it is convenient to carry out noisy work, especially in big cities. Aircrew, for example, comes in and out of the hotels at different times of the day, so the need for quiet is very important. Noisy works, for example, need to be coordinated in a manner that gives the guests the least amount of disturbance. As such, we have to engage with the hotel management to ensure that these types of works are carried out and completed as swiftly as possible.

Modern Hotel Lobby With Sleek Staircase

Project Examples

View Projects
  • Hotel Dining Room
  • Modern Hotel Toiletry
  • Bold Hotel Lobby
  • Hotel Building Staircase

Multi-Floor Fit Outs

The biggest plus point when working for different hotel chains is that the works and finishes vary immensely, so no project is ever the same. For instance, one project may involve multi-floor fit-outs, such as a bedroom roll where corridors are closed off until all of the bedrooms on any given floor are completed.

These bedroom projects are particularly logistically challenging, especially in terms of removing old fittings/beds, etc. and bringing in new replacement items. Some of these hotels could have 15 floors, and external elevation platforms and debris chutes to remove all of the old fittings and beds would need to be installed.

Other projects may include the need for a restaurant or breakfast area to be closed off whilst refurbishment works are carried out; this being the case, temporary eating facilities would need to be set up in the conference room and retaken out of service temporarily. Temporary entrance and exit doors must also be introduced while the work progresses. Refurbishment works taking place in existing hotels have, as already mentioned, their unique challenges which are not easily overcome and regular coordination meetings are needed to plan daily the works required to take place so that they can be carried to the agreed areas and swiftly to minimise disruption of the day to day running of the hotels.

P&W Interiors personnel are very much involved in design and coordination meetings with the client, designers, and health and safety personnel as things change. We need to ensure that all changes are picked up and agreed upon so the end product is satisfactory to all parties involved. When completed, these projects are something we at P&W Interiors are immensely proud of.

If you would like to contact experienced hotel fit-out experts, use our quick and easy contact form below.

Frequently Asked Hotel Fit Out Questions

What is included in a hotel fit out?

A hotel fit out typically includes interior design, furniture installation, electrical and plumbing works, flooring, decorating, lighting, joinery, and final finishing. It covers everything required to transform your space into a fully operational guest environment.

How long does a hotel fit out take?

Project timescales vary depending on the size of the hotel, the complexity of the design, and whether the property remains open during the work. Most hotel fit outs take between several weeks and a few months. A detailed schedule is provided after the initial site assessment.

Can you complete a hotel fit out while the hotel stays open?

Yes, many hotel fit outs are completed in live environments. We can phase the work, manage noise levels, and operate around peak occupancy to minimise disruption to guests and staff.

Do you manage the entire hotel fit out project?

We offer full project management, including concept design, planning, procurement, installation, and final inspection. This ensures a seamless hotel refurbishment from start to finish with a single point of contact.

Do you work with independent hotels and national chains?

Yes, we partner with a range of hospitality clients, from boutique and independent hotels to major international chains. Notable collaborations include groups such as The Marriott Group and Holiday Inn Express, as well as many independent operators and large hotel brands. We tailor our fit out solutions to fully align with each client’s brand standards, operational requirements, budgets, and unique design vision, ensuring seamless execution regardless of scale or complexity.

Can you help with hotel bedroom and bathroom refurbishments?

Absolutely. We fit out complete hotel bedrooms, suites, bathrooms, communal areas, reception spaces, bars, restaurants, and back-of-house areas. Every space is designed for comfort, durability, and guest satisfaction.

Do you supply hotel furniture and fixtures?

Yes, we can source and supply hotel-grade furniture, fixtures, fittings, and bespoke joinery. All products are chosen for quality, durability, and compliance with hotel industry standards.

How do you ensure the fit out meets hotel safety regulations?

We follow all relevant UK building regulations, fire safety requirements, accessibility standards, and health and safety guidelines. Compliance is built into every stage of the project.

How much does a hotel fit out cost?

Costs depend on the size of the project, materials, design specification, and timescales. We offer transparent quotes after a consultation and site survey.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Hotel Fit Out

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.