Education Refurbishment, York.

The Project

The school required a remodel of its existing teaching spaces to improve functionality, increase classroom capacity, and create a modern learning environment for pupils and staff. The existing layout contained smaller classrooms that were no longer suitable for the school's evolving needs.

The project needed to be delivered within a live educational environment, with careful planning to minimise disruption to staff, students, and daily school operations.

  • Client: Esrick School
  • Sector: Education
  • Location: York
  • Type: Refurbishment
  • Project Value: £250k

Our Solution

Working closely with the client, we undertook a comprehensive internal refurbishment programme that included:

Removal of existing internal partition walls; structural alterations to create larger, more flexible classroom spaces. Installation of new partition walls where required, with complete redecoration throughout the affected areas; supply and installation of new flooring finishes; replacement and upgrading of internal doors. And finally, installation of new energy-efficient LED lighting throughout.

Our team coordinated with all trades to ensure a seamless delivery programme.

Results

The completed refurbishment has transformed the school's learning environment, delivering:

Larger, more adaptable classroom spaces; improved teaching and learning facilities with enhanced aesthetics throughout the school; the installation of new LED lights provides better lighting quality and energy efficiency. Durable finishes designed for long-term use, even with children’s muddy hands, giving a refreshed environment for both students and staff.

Client Benefits

  • Increased classroom capacity
  • Modern, fit-for-purpose learning spaces
  • Improved staff and student experience
  • Reduced maintenance requirements
  • Enhanced energy efficiency
  • High-quality finishes delivered on programme
eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Education Refurbishment, York

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.