Our latest successful undertaking here at Pacy & Wheatley was a retail interior fit-out project in East Sussex. It was for the Cooperative Group and involved crucial fire prevention works, along with repairs and decoration.

The challenge that our team here at Pacy & Wheatley was called in to solve was the lack of adequate fire prevention in many of the stores. A situation that was caused primarily because many of the buildings in question were a combination of residential and retail space.

The particular challenges involved in this project included the need to fireproof steel girders and work in spaces that were restricted, yet also contained much of the vital cabling for both the stores and residential buildings.

We are happy to announce that our team successfully completed these fire prevention works in a space of 3 months, despite many of the jobs being significantly varied. For example, in some stores, only minor works were needed. While in others entire ceilings had to be removed and steel columns fired proofed with 60 minutes protection.

Indeed, to solve the issues mentioned above we found it effective to have our electrical contractor remove any unnecessary wiring. Then label the rest so it could be laid neatly into Galvanised trunking, something that allowed for safer access to the steels and walls that needed to be fireproofed.

Additionally, when we discovered that in some cases there was no fireproofing between individual retail spaces, we installed a 60-minute fire curtain to enhance protection.

Finally, in addition to the fire safety works completed through this project our qualified and competent team installed new suspended ceilings and ensured that the spaces affected were decorated to a high standard. Something that left them fresher and more pleasant, as well as safer spaces to live and work.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Retail Interior Refurbishment – Co-op

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.