Interior refurbishment, Sheffield Children’s Hospital

  • Client:
    Sheffield Children’s Hospital
  • Sector:
    Hospitals
  • Type:
    Aseptic Suit Refurbishment
  • Procurement:
    Competitive
  • Location:
    Sheffield

The Project

Pacy and Wheatley Interiors has just completed this interior refurbishment/construction project at Sheffield Children’s Hospital. The works undertaken included a full strip out and refurbishment of the Aseptic Unit and offices, also the Construction of a new roof plant room compromising of new Steel frame, SFS wall and floor construction, Rock panel Cladding and New Flat Roofing. This is our first project for this new client and their project management team, and we are looking forward to building on this new relationship.

The Challenge

The main challenge was working within the live environment of the Hospital. Measures were put in place to ensure everything is handled carefully, making sure all noise is kept to a minimum and as the Hospital is on a main road, keeping site traffic down as little as possible. Pacy and Wheatley ensured extensive consideration for all neighbouring persons and those within the local vicinity, in order to ensure disruption was minimised.

As a Considerate Contractor, all plant and machinery used and site noise was kept to a minimum, with the assurance that any loud activities will be properly planned and managed to ensure minimum disturbance to all.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Interior refurbishment, Sheffield Children’s Hospital

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.