Refurbishment at Bridlington Spa

  • Client: Bridlington Spa
  • Sector: Leisure
  • Type: Retail & Leisure
  • Procurement: Tender/Negotiated
  • Location: Bridlington
  • Project Value: £200,000

The Project

Pacy and Wheatley Interiors became involved with a retail refurbishment, at Bridlington Spa, through the Yorbuild framework. We worked with East Riding council to create a new bar and complete the remodeling of the main space to provide a modern and contemporary feel. The refurbishment also included a new flooring and bar to the entire reception entrance with views of the south Bay. The original Spa on the site was built in 1896, which consisted of a theatre and seaside pavilion. A fire in the theatre destroyed the venue in1906 and a then a replacement opera house was built in 1907, and this still forms part of the building today. In 1914 the local authority took control of the buildings, acquiring the building in 1919, then in 1926 rebuilt all but the theatre. In 1932 another fire destroyed these later buildings, and immediately work started to construct their replacement, which is what you see today.

The Solution

Our experience in this field was called upon to assist with the design and construct of the project. The work had to be carried out whilst the spa was in operation and required managing very carefully. The existing bar was removed and the area stripped back to allow new finishes and installation to the floors and walls, the bar now offers new ranges of food and cakes for a relaxing afternoon overlooking the bay.

The project was completed and officially opened by the Mayor of Bridlington on the 24th March 2017 ready for business.

For further information on how we can help with your Interior refurbishment or shop fit, please Contact Us.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Refurbishment at Bridlington Spa

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.