Retail leisure Fit Out, Lakeside Doncaster

  • Client: Doncaster Council via Drivers Jonas
  • Sector: Leisure Facilitates
  • Type: Design & Build | Internal Fit Out
  • Procurement: Tender/Negotiation
  • Location: Doncaster Keepmoat Stadium
  • Project Value: £700,000

The Project

Doncaster Council awarded Pacy & Wheatley Leisure Construction the contract to fit out the new fitness suite of the newly developed Keepmoat Stadium in Doncaster, home of Doncaster Rovers Football Club. The project consisted of ground floor reception area and stairway leading to a large open space on the first floor which required transforming into a fully operational membership fitness club. Within the facility a further large reception area was constructed with Starbucks Coffee shop, tanning and physio facilities. Additionally changing areas, sauna, steam room, offices, gym area and studio training room were completed with full lighting, air conditioning, video display and PA system. Working with Drivers Jonas project management team and employing the main stadium architect ACP, a good relationship was formed which resulted in a first product.

The Challenge

Completing the works within a very short programme period of thirteen weeks.

Co-ordination of the design and materials to be utilsed to ensure a first class product was delivered.

Acheive Zero reportable accidents.

Works to be completed within the budget Interaction with busy public areas

The Solution

Pacy & Wheatley carefully selected Doncaster based sub contractors to enter the team. On going team discussions proved invaluable as the specification was lifted substantially without additional costs to the client. Further meetings held with all concerned to discuss and brainstorm ideas, produced a first class design.

The project was carefully programmed with good site management in place. With regular team and meetings taking place ensured on time completion and to budget.

Cost forcasting providing information regularly to ensure informed decisions by Client.

Timed deliveries following liason with the stadium management company assured safe access to the operation.

Key Achievements

Completion on time and to budget.

Zero reportable accidents.

Good relationship achieved with client and professionals.

A first class product within an exiting new area of the town.

Further possible works from the Stadium.
Received total dedication from supply chain to achieve completion of a very tight project.

Testimonials

Completion on time and to budget.

Zero reportable accidents.

Following completion of the Health and Fitness Centre fit out, I felt it was appropriate to formally thank you and your team on a job well done! I was very impressed with your proactive approach and commitment to providing the client with a quality product. I know the Borough Council are very pleased with the finished scheme and I would be happy to recommend Pacy and Wheatley in the future.

Stephen Jepson, Project Manager, Drivers Jonas.

For further information on how we can help with your Interior refurbishment or shop fit, please Contact Us.

eBook Cover

    Download Our

    Flip eBrochure

    Please enter your details below to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    Nottingham University Hospitals, NHS Trust

    Pacy & Wheatley Interiors were contacted in regard to getting involved in an urgent project to completely strip out and refurbish the Southwell Ward at Nottingham City Hospital. The brief to this project was that once commenced, this project needed to be completed in 12 weeks, a very tall undertaking based on the amount of work involved. However, after several meetings, a programme was put together which involved a large portion of the works being carried out on both days and nights, 6 days a week, in order to give all involved the best chance of completing the works to a very challenging timescale. The works undertaken involved the full strip out of the existing ward, including substantial M&E works, new flooring to all the wards, new doors, new counters and Kitchen units were also installed on the Joinery element of the works. New lay in grid Ceilings were installed along with specified LED Lighting upgrades and the whole ward was fully Decorated throughout.

    This, in essence, was a monumental challenge for all involved, including the Architect, Consultants, the in-house NHS team, and, of course, the P&W site and Management team. The delivery of this project needed careful planning and completion of areas of the ward in a phased manner to ensure that all of the trades involved could access specific areas to complete their works. This was achieved for the most part due to thorough planning and due consideration given to all of the trades participating on the project.

    Pacy & Wheatley have now delivered a modern, state-of-the-art facility for both Hospital patients and staff, completed in record time. Thanks must go to all involved for their dedication and application in ensuring we got over the line and completed this project. Many Thanks to both Adam Cox ( Site Manager ) along with Steve Shaw ( Project Manager ) and Charlotte Wheatley ( Project QS ) for their outstanding effort in delivering this project which was delivered with zero accidents which in itself is a testament to the planning and execution of the works.

    Error: Contact form not found.

      Contact me regarding... Retail leisure Fit Out, Lakeside Doncaster

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy.

        Contact Us Today

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.